Long Tunnel Inspection
Ocean Modules has completed a long tunnel inspection of the Forsmark nuclear power plant cooling water system. The survey was commissioned by SUAB. The penetration goal was 1450 m. By the end of the survey over 1700 m had been successfully inspected.
The Ocean Modules V8 Sii long tunnel inspection solution is a light, mobile, fiber optics-based platform with a reach of up to 2500 m.

Recent News
ROVPACK Unveiled
Ocean Modules has demonstrated a new backpack concept for light ROV transportation, making jobs in water towers, small platforms and confined spaces even simpler and safer.
Read More
First RESROV sold
Ocean Modules has kicked off the push into drinking water reservoir and hot water system inspection services together with K.A.J. Dykkertjenste AS, representing 25 years of experience in the market.
Read More
HOTROV and RESROV Launched
Today, Ocean Modules announces two new ROV concepts specicfially for safe and painless inspections of drinking water reservoir tanks and hot water systems.
Read More
V8 Sii ROV Technicians Certified
Two technicians from Seismic Asia Pacific have completed training for the correct operation, handling, maintenance, servicing, and fault-searching of the V8 Sii range of remotely operated vehicles.
Read More

